Le rapport est également disponible en Français.
Mali's National Renewable Energy Action Plan (PANER) has set ambitious goals for both conventional and off-grid systems. For a connected system, the installed capacity of renewables, including large hydropower plants, is expected to reach 1 416 megawatts (MW) by 2030, which is a nine-fold increase from 2010. For off-grid renewables, installed capacity is expected to increase from 20 MW in 2010 to more than 600 MW by 2030, a 30-fold increase over the period. Ambitious targets have also been set for ethanol and biodiesel.
The findings of the Renewable Energy Readiness Assessment (RRA) highlight major obstacles to the widespread deployment of renewable energy systems. They identify critical actions that could have a significant impact on increasing renewables in the short and medium term.
Among the recommendations: